Date

Attendees

Goals

Discussion items

TimeItemWhoNotes
5minthe eduKEEP surveyDavide Vaghetti
  • It would be good to know how completed surveys we had so far
15minTNC17

Davide Vaghetti

Justin Knight

Maarten Kremers

  • we should apply for the 5min Lighting Talk to present the surveys results
  • we should check if it's possible to hijack some of the time reserved for federations to update on the whole eduKEEP project
15minFirst internal Milestone (M10)All
  • M10, dued by the end of February, should be postponed to the end of March since we have to wait for the survey results
5minInternal rules for document editingJustin KnightUse a single Google Doc with all of the above as headings, with a lead author for each section. Existing material at:
https://drive.google.com/drive/folders/0B3ls_fcTTBRKfjhTczRUVmNLUHBFR0l5eG5GVW9OM3BpNzY1cTNQNUhFOW9ZaGRnQXBXbTg
10minMiddle and long term planningAll
  • First official deliverable – Best Practice for User Centric Federated Identity -- is dued by the end of October: all the internal deliverables will be the building blocks:
    • M10 (see above)
    • M12 Develop reference technical architecture ( Davide Vaghetti can leverage work from AARC)
    • M16 Develop policy/legal framework (there are already existing documents in GN4 and AARC projects)
    • M16 Recommendations for interfederation (could be good to engage some of the eduGAIN SG members)
  • The pilots are the steering point of the project: to be run between M18 - M28, this means finding pilot participants before the summer break and having infrastructure ready to start.
  • Sclifos Constantin points out that we also need conditions for the Pilot. This could be done as an MoU.